About Us
Projects
ESG
Investor Centre
Large Gold System Hosting 3.9Moz gold and 26.1Moz silver in resources with significant scope to grow
The Dynasty Project is a development ready gold project 100% held by Titan Minerals, with high grade epithermal gold-silver and porphyry copper mineralisation confirmed by drilling.
The Project comprises 5 contiguous concessions with a total area of 139km2, with permitting in place for full exploration and small-scale mining.
Dynasty is located in the Loja Province in southern Ecuador, approximately 5 kilometres from the town of Celica, which has a population of approximately 5,000 people, where the Company has accommodation and access to labour, food and hardware supplies. The Dynasty Project is around two hour’s drive from to the Catamayo airport, which has daily flights to Quito.
Access to the Project is via sealed Highway (E68), where adjacent to the highway the Company has a fully equipped exploration office with purpose-built core storage facilities, located on the Project’s northwestern lease, Zar 1. Access to the Cerro Verde prospect is approximately 1 kilometre by gravel roads from the Company’s office facilities. The project has power, water, and internet coverage to the office facilities.
The project elevation average is ~1,100m and is covered by a mix of pasture and forest, with most landowners at the project being peasant farmers. Exploration conditions are excellent with field work possible all year round, and diamond drilling capability 24 hours per day. Ecuador experiences a wet season for approximately 2-3 months of the year between February and April, where a higher level of rainfall is experienced, but this seldom affects exploration activities.
Dynasty hosts a JORC Compliant Mineral Resource Estimate of 65.6Mt @ 1.85 g/t Au, 12.38 g/t Ag for a contained 3.90 million ounces of gold and 26.10 million ounces of silver across the Cerro Verde, Iguana, Papayal and Trapichillo deposits, updated March 2026. For full details refer to ASX release Dynasty Project Enhanced by Resource Growth, March 2026.
Dynasty Mineral Resource Summary:
The Cerro Verde MRE was completed by Entech Pty Ltd (Competent Person) and is based on 379 diamond drill holes for 68,596m of diamond core, together with 169 channel samples and 878 trench samples comprising an additional 6,606m of surface sampling. The updated MRE is considered suitable for progressing with Dynasty Gold Project Scoping Studies.
The Cerro Verde deposit extends from surface over an area of approximately 2km by 1.7km, down to a depth of ~670m, and encompasses two key areas of mineralisation: the Brecha-Comanche epithermal vein system and the Kaliman porphyry deposit. Resource expansion drilling has confirmed strong depth continuity at Brecha-Comanche while also defining extensive zones of porphyry-hosted mineralisation at Kaliman.
The MRE for the Iguana, Trapichillo and Papayal deposits remains unchanged from the July 2023 MRE, totalling 14.7Mt @ 2.52 g/t Au, 20.98 g/t Ag for a contained 1.19Moz gold and 9.94Moz silver. For full details refer to ASX release Dynasty Maiden JORC MRE, July 2023.
Ongoing exploration work programs at the Dynasty Project include detailed surface mapping and surface geochemistry – soil, rock and stream sediment, channel and trench sampling programs.
Stream sediment sampling has been completed across primary and secondary drainage systems across the project, with each sample representing a catchment area of approximately 10km². The stream sediment survey is aimed at assessing the exploration potential across the entire project area, particularly in the central and southern portion of the project, where no exploration has ever been completed.
Systematic soil sampling programs have been completed across the majority of the Dynasty Gold Project.
Titan’s focus to date has been the Cerro Verde prospect, where detailed geological mapping has been undertaken over the Brecha-Comanche, Foto, Encuentros, Gorda, and Regorda Vein Systems, and also the Kaliman and La Zanja porphyry targets.
Mapping has also been expanded to include the Papayal, Trapichillo and Cola prospects, which represent excellent epithermal gold and porphyry copper targets which have the potential to significantly grow the current resource.
Mapping at the Cerro Verde prospect has identified three main structural orientations:
The Kaliman porphyry target exhibits characteristics of the shallow portion of a porphyry copper system, with soil geochemistry and alteration mapped at surface indicating advanced argillic, phyllic and minor potassic alteration.
Strong depth continuity has been confirmed at Brecha-Comanche down to ~740m vertical depth, with wide and high-grade intersections incorporated into the updated March 2026 MRE. Porphyry-hosted gold-silver mineralisation at the Kaliman prospect has also been defined and reported in the MRE for the first time, further demonstrating the scale of the Cerro Verde system.
The updated MRE provides a solid foundation for scoping studies and continued resource growth, in what Titan believes is a natural progression for the Dynasty Project. Considerable exploration upside remains to be tested across the ~10 kilometre epithermal gold vein corridor and porphyry copper mineralisation at the Kaliman, Cola, Giselle and La Zanja prospects.